Skilled in developing various projects such as Connectivity, Protocols, Energy Metering, Alarms, and Air Condition Controller Projects.
5 MW project at village Sivlakha, Taluka Bhachau, District Kuchch. The roll of Kaihatsu was Project Coordinator. Kaihatsu took full responsibility of the project. This included, a project feasibility report, a detailed bankable project report, weather data setup and collection, supplier selection, finance tie up, plant design, contractor selection.
5 MW project at village Chadian, Tahasil Santanpur, District Patan. The roll of Kaihatsu was Project Management Consultants. Kaihatsu took full responsibility of the project. This included, a project feasibility report, a detailed bankable project report, weather data setup and collection, supplier selection, finance tie up, plant design, contractor selection, construction supervision, commissioning and optimisation.
1 MW project at village Patadi, Tahasil Dasda, District Surendra Nagar. The roll of Kaihatsu was Project Coordinator. Kaihatsu took full responsibility of the project. This included a project feasibility report, a detailed bankable project report, weather data setup and collection, supplier selection, plant design, contractor selection, construction supervision, commissioning and optimisation.
5 MW project at village Charanka, Tahasil Radhanpur, District Patan. The roll of Kaihatsu was as a Consultant. Kaihatsu’s responsibility included, project feasibility report, detailed bankable project report, Tender Design for supplier selection, Tender Evaluation.
5 MW project at village Charanka, Tahasil Radhanpur, District Patan. The roll of Kaihatsu was Project in Charge. Kaihatsu’s responsibility included, project feasibility report, detailed bankable project report, weather data setup and collection, supplier selection, plant design, contractor selection, construction supervision, commissioning and optimisation. Kaihatsu also signed 10 year’s Operation and Maintenance contract for this project.
The group is undertaking a 11 MW project in village Nimbal, Taluka Indi, District Bijapur, State Karnataka.We have been assigned as Project Management Consultants for this project. This project is under Government bidding.
The group is undertaking a 31.5 MW project in village Mansa, District Bhatinda, State Punjab.We have been assigned as Project Management Consultants for this project. This project is under Government bidding.
The group is undertaking a 55 MW project in village Orai, District Lucknow, State Uttar Pradesh. We have been assigned as Project Management Consultants for this project. This project is under Government bidding.
Kaihatsu has worked as Consultant. The main work included product development, telecom tower solar work, product development and the like. PAE also has a module-manufacturing unit.
Kaihatsu has worked as Consultant. The main work includes product development, solar water pumps and work on various small solar products like the solar lantern..
Kaihatsu has worked as Consultant. The main work includes product development of solar water pumps.
Kaihatsu has worked as Consultant and as Product Developer. The main work includes product development for a solar street camera system and solar steam generation..
Kaihatsu has worked as Consultant. Municipal Corporation is coming up with roof top solar system for all their municipal buildings. Kaihatsu’s roll is to formulate the tender, evaluate the bids. The project size is for 200 kW roof top.
Kaihatsu has worked as Consultant. The main work includes system study for micro hydro system and 100 kW wind energy systems.
Kaihatsu is working as solar consultants.
Explore a glimpse of our distinguished clientele utilizing our SCADA systems across a range of industries, including manufacturing, utilities, transportation, and more.
20 MW project at Toiechi prefecture, Japan. The roll of Kaihatsu was Design & Engineering. Kaihatsu took full responsibility of all the design, engineering of electrical, mechanical and civil work of the project.
Kaihatsu is also engaged in development of of 50 kW Hydrogen fuel cell system for mobile towers in Malaysia. This contract has been awarded to us by a Malaysian company.
Products based on this design are presently sold in India.
Kaihatsu is constructing 15 kg per hour, 1400C, industrial steam generation unit for effluent treatment for Ahmadabad based industrial unit. The project is under construction and will be ready by May 2016.
5 kW project at GNFC Plant in Bharuch, Gujarat. The roll of Kaihatsu was total turnkey solution. This project was done as a contractor for Equinox Systems Pvt. Ltd.
1 kW to 15 kW meditation rooms. Total numbers of rooms all over India were 250. Each room had different electrical specification. The roll of Kaihatsu was total turnkey solution. This project was done as a contractor for Equinox Systems Pvt. Ltd.
The group is undertaking a 55 MW project in Uttar Pradesh. We have been assigned as Project Management Consultants for this project. All projects are expected to complete till June 2017. This is under various Government bidding.
This is a 5 MW project in Anantpur district, Andhra Pradesh and we are working as turn key solution provider for land selection, technology selection, supplier selection, designing, engineering and construction supervision. The project is for Captive consumption.
This is a 1 MW project near Hyderabad, Telangana state and we are working as turn key solution provider for land selection, technology selection, supplier selection, designing, engineering and construction supervision. The project is for Captive consumption
This is a 5 MW project in Andhra Pradesh. We are working as the Owner’s Engineer.
These are 18 various projects of the capacity 1MW, 2 MW and 3 MW capacity each. We are working as turn key solution provider for land selection, technology selection, supplier selection, designing, engineering and construction supervision. These projects will be in Belgavi District, Karnataka state. They are expected to be scheduled by December 2016.
These are seven roof top projects of 500 kW each within the states of Maharashtra, Gujarat and Rajasthan. Expected date for completion is September 2016. These are all net metering project.
His is single location solar project in Tunisia, North Africa. Design Stage is over and project is under construction. Expected date for completion is December 2017. We provide Designing, Engineering, Sourcing and Cost Optimisation solution.