Allows individuals and businesses to generate their own electricity, reducing dependency on centralized energy grids.
Our ultimate source of energy is Sun. The pivotal point of our
existence. One that breaks a new dawn every morning. Why the
sun radiates to the earth more than 10,000 times the amount of
energy that the entire world would consume annually?. Probably
because the high and mighty sun knows better that its energy
can be used in more ways than how the plants photosynthesized,
the animals soaked or the mankind knew.
May be the sun
understood that many years from its birth, the world would
wake up to see the sun as a clean, efficient, bankable and
sustainable source of renewable energy. Energy that would be
cheaper than any kind of power supply, cleaner with zero CO
emissions and accessible to areas where the grid supply could
not reach. And in a world battling with energy crisis and
global warming, someday, a far-sighted company will herald a
revolution and the world would see a million suns rising...
There is no better source of clean and natural energy than the
sun. It radiates more than 10,000 times the amount of energy
that the entire world would consume annually. Given its
abundance, solar energy can cater to the ever-increasing
demand for fuel and make for an efficient source of renewable
energy. It is probably the only source of energy that emits no
noise while generating power. In addition, it is modular,
scalable and highly flexible in nature.
In the long run, electricity generated from solar energy
systems will be far more cost-effective than any other type of
power supply. Not only can power generation become profitable
at break-even, despite relatively high initial set-up cost,
but solar energy is free from cost escalation.
In remote areas such as rural hamlets, forest reserves,
environmentally-sensitive areas and national parks where grid
supply is not available, off-grid standalone and home lighting
systems often serve as a lifeline. Technology development has
enabled solar energy systems to supply power 24x7.
Kaihatsu Solar aims to power Indian communities by providing
clean and cost-effective solar electricity, and is committed
to achieving grid parity by 2017. Kaihatsu Solar is also
working to reduce the cost of setting up solar energy systems
for bulk power generation.
5 kW project at GNFC Plant in Bharuch, Gujarat. Kaihatsu roll was total turnkey solution. This project was done as a contractor for Equinox Systems Pvt. Ltd. We took the full responsibility of the project. This include, project feasibility report, detailed bankable project report, supplier selection, finance tie up, plant design, construction.
1 kW to 15 kW meditation rooms. Total numbers of rooms all
over India were 250. Each room was with different electrical
specification. Kaihatsu roll was total turnkey solution.
This project was done as a contractor for Equinox Systems
Pvt. Ltd. We took full responsibility of the project. This
include, project feasibility report, detailed bankable
project report, supplier selection, plant design.
In 2009, Government of India introduced Generation Based
Incentive Scheme. Gujarat Solar Policy 2009 followed after
that. From those years, Kaihatsu got engaged in Grid
Interactive Mega Watt Scale Ground Mounting Solar Photo
Voltaic projects. Following is the list of projects
undertaken.
5 MW project at village Sivlakha, Taluka Bhachau, District Kuchch. The roll of Kaihatsu was Project Coordinator. Kaihatsu took full responsibility of the project. This included, a project feasibility report, a detailed bankable project report, weather data setup and collection, supplier selection, finance tie up, plant design, contractor selection.
5 MW project at village Chadian, Tahasil Santanpur, District Patan. The roll of Kaihatsu was Project Management Consultants. Kaihatsu took full responsibility of the project. This included, a project feasibility report, a detailed bankable project report, weather data setup and collection, supplier selection, finance tie up, plant design, contractor selection, construction supervision, commissioning and optimisation.
1 MW project at village Patadi, Tahasil Dasda, District Surendra Nagar. The roll of Kaihatsu was Project Coordinator. Kaihatsu took full responsibility of the project. This included a project feasibility report, a detailed bankable project report, weather data setup and collection, supplier selection, plant design, contractor selection, construction supervision, commissioning and optimisation.
5 MW project at village Charanka, Tahasil Radhanpur, District Patan. The roll of Kaihatsu was as a Consultant. Kaihatsu’s responsibility included, project feasibility report, detailed bankable project report, Tender Design for supplier selection, Tender Evaluation.
5 MW project at village Charanka, Tahasil Radhanpur, District Patan. The roll of Kaihatsu was Project in Charge. Kaihatsu’s responsibility included, project feasibility report, detailed bankable project report, weather data setup and collection, supplier selection, plant design, contractor selection, construction supervision, commissioning and optimisation. Kaihatsu also signed 10 year’s Operation and Maintenance contract for this project.
The group is undertaking a 97.5 MW project in different state.
We have been assigned as Project Management Consultants for this project. This project is under Government bidding.
20 MW project at Toiechi prefecture, Japan. The roll of Kaihatsu was Design & Engineering. Kaihatsu took full responsibility of all the design, engineering of electrical, mechanical and civil work of the project.
The group is undertaking a 55 MW project in Uttar Pradesh. We have been assigned as Project Management Consultants for this project. All projects are expected to complete till June 2017. This is under various Government bidding.
This is a 5 MW project in Anantpur district, Andhra Pradesh and we are working as turn key solution provider for land selection, technology selection, supplier selection, designing, engineering and construction supervision. The project is for Captive consumption.
This is a 1 MW project near Hyderabad, Telangana state and we are working as turn key solution provider for land selection, technology selection, supplier selection, designing, engineering and construction supervision. The project is for Captive consumption
This is 5 MW project in Andhra Pradesh. We are working as Owner’s Engineer.
These are 18 various projects of the capacity 1MW, 2 MW and 3 MW capacity each. We are working as turn key solution provider for land selection, technology selection, supplier selection, designing, engineering and construction supervision. These projects will be in Belgavi District, Karnataka state. They are expected to be scheduled by December 2016.
These are seven roof top projects of 500 kW each within the states of Maharashtra, Gujarat and Rajasthan. Expected date for completion is September 2016. These are all net metering project.
This is single location solar project in Tunisia, North Africa. Design Stage is over and project is under construction. Expected date for completion is December 2017. We provide Designing, Engineering, Sourcing and Cost Optimisation solution.
Kaihatsu has worked as Consultant. The main work included product development, telecom tower solar work, product development and the like. PAE also has a module-manufacturing unit.
Kaihatsu has worked as Consultant. The main work includes product development, solar water pumps and work on various small solar products like the solar lantern.
Kaihatsu has worked as Consultant. The main work includes product development of solar water pumps.
Kaihatsu has worked as Consultant and as Product Developer. The main work includes product development for a solar street camera system and solar steam generation.
Kaihatsu has worked as Consultant. Municipal Corporation is coming up with roof top solar system for all their municipal buildings. Kaihatsu’s roll is to formulate the tender, evaluate the bids. The project size is for 200 kW roof top.
Surat is declared as solar City. Kaihatsu is working as Consultant. Municipal Corporation is coming up with a roof top solar system. Kaihatsu’s roll is to formulate the tender and evaluate the bids. The project size is 750 kW roof top.
Kaihatsu has worked as Consultant. The main work includes system study for micro hydro system and 100 kW wind energy systems.
Kaihatsu is working as solar consultants.
Description : Full turn-key project for setting up the manufacturing unit of Solar Photo Voltaic module. The technology provider can give the technology for two different types of modules. Amorphous Silicon and thin Film CIGS.The first one is a well established technology in market so there is a large market demand. However the cost and availability of Silicon as raw material has forced the market to move on making a solar cell other than Silicon. Thus CIGS is an emerging technology now
Advantages : Large Export and Domestic Market.
What Kaihatsu can do : Technology tie up + project monitoring
Other Information : Government of India special 20% grant of the project cost for semiconductor industry is applicable.
Remarks : Nil.
Description : The power plants feeding the electricity to grid. The plants (size of 1 MW and above) are promoted by Indian Government. Maximum capacity at present is restricted to 10 MW per stats. However some stats like Rajasthan,West Bengal,Haryana have made their own policy giving higher rate than central and in some cases removing the restriction on capacity
Advantages : Present rate of Rs. 15/- unit with carbon credits makes it very attractive financial proposal. The real income will be very high after 10 years when the plant becomes debt free. The plant life is 30 years and with no need for raw material it is the best business.
What Kaihatsu can do : Full turn key project
Other Information : Nil
Remarks : At present Kaihatsu is setting up a power plant of 5 MW in village Sivlakha, Bhuj, Gujarat for our customer M/s Euro Solar Power Pvt. Ltd.
Description : A thermic fluid is heated using mirrors and solar energy. This fluid makes a steam. This steam can be use to generate the power using normal steam generator.
Advantages : Unlike PV, solar thermal can work in night well as with alternate fuel. Unlike PV, the efficiency increases with the heat.Hence ideally suited for India.
What Kaihatsu can do : Technology tie up + project monitoring
Other Information : Rajasthan Government has announced a policy for Rs. 13.78/- per unit on Solar Thermal.
Remarks : Nil.
Description : Wind generators and solar PV is used to charge the batteries,they produce electricity which is uninterrupted.
Advantages : It gives uninterrupted power for 24 hrs. Good for hospitals, IT companies, high end houses. Specially good for India as load shedding is a problem.
What Kaihatsu can do : System development + system integration
Other Information : Nil.
Remarks : Nil.
Description : This is a small heat cycle engine which uses Solar thermal or any other fuel. This only works for 1 MW or lower. It can use any available agriculture waste material as a fuel.
Advantages : Small systems for farmers, Better control on system.
What Kaihatsu can do : Technology tie up + project monitoring
Other Information : Nil
Remarks : Nil
Description : This is a based on concentrating dish and sterling engine. The sterling engine is a small heat engine can generate power for small house(s) 10KW or 25 KW. Effective for agriculture as no need of long cables. Independently monitored system.
Advantages : Rather than giving the free electricity to farmers, they can be given dish through financial agencies like NABARD. This will remove the burden on utility companies. NABARD can earn interest and carbon credits.
What Kaihatsu can do : Technology tie up + Coordination for engine development.
Other Information : The system is only up to 25KW
Remarks : Nil.
Description : Lot of small items like solar latern, mobile chargers, toys battery chargers, street lights, garden lights can be developed using solar, wind or both.
Advantages : Ancillary development + increase of product range.
What Kaihatsu can do : Full development.
Other Information : Nil
Remarks : Nil
Description : Other application.
Advantages : Ancillary development + increase of product range.
What Kaihatsu can do : Not much role.
Other Information : The system is only up to 25KW
Remarks : Nil.
And always stay informed of the latest company news and events!